Backstage Bites 22nd January 202227th August 2020 by Site Admin Updated 2nd October 2021THIS INFORMATION POST HAS NOW BEEN GIVEN IT’S OWN NEW TOP-LEVEL PAGE. PLEASE VISIT “Menu & Catering” here… for the latest details.BACKSTAGE BITESFOOD MENUPREVIOUSLY THE MENU WAS PLACED HERE BUT HAS BEEN UPDATED… To find the current menu please use the link above to the main page. Thank you. I look forward to seeing you all very soon,Peter Cliffe for Backstage BitesPhone 07801 351863Email [email protected]
Major Club Refurbishments 2019 Part.7 27th October 201926th October 2019 by Site Admin Kay on site LATEST REFURBISHMENT PICTURES…Here are the latest set of pictures taken at the club during the ongoing works.These photos were taken upon a site visit on October 24th 2019. Enlarged bar refurbishment View from bar to stairs and lift View across enlarged bar to double width entrance Reduced sized office to accommodate double width bar entrance Lift exit New double width bar entrance. Small chair lift to be added to left hand stairs Bar refurb in progress Bar refurb from entrance Lift shaft having reflective facia being added
Major Club Refurbishments 2019 Part.6 19th October 201917th October 2019 by Site Admin LATEST REFURBISHMENT PICTURES…Here are the latest set of pictures taken at the club during the ongoing works.These photos were taken upon a site visit on October 10th 2019. Kay on site Hall renovation New wall panels in hall Exit from lift at top of stairs Enlarged bar being refurbished New double width entrance to bar View of entrance hall from office Green room (temporary site office) Reduced size office
Major Club Refurbishments 2019 Part.5 19th October 201930th September 2019 by Site Admin Kay on site LATEST REFURBISHMENT PICTURES…Here are the latest set of pictures taken at the club during the ongoing works.These photos were taken upon a site visit during mid September 2019. The green room renovation Reduced size office renovation Exit from lift to double width upper foyer Top of suspended lift and exit to bar Lift shaft in situ pre cladding Re wiring the entrance Lift platform New ceiling above stage New stage area Kitchen refurbishment
Major Club Refurbishments 2019 Part.4 15th September 2019 by Site Admin MORE PICTURES OF THE REFURB... On going refurb pictures taken during late August 2019. Preparing exit from lift Double width entrance to bar Kitchen renovation Steel shaft for lift in situ Lift exit space